DEMURRAGE & DETENTION CHARGE
  • USA IMPORT D&D
  • USA EXPORT D&D
  • CANADA IMPORT D&D
  • MEXICO IMPORT D&D
  • MEXICO EXPORT D&D
  • EUROPE IMPORT D&D
  • AUSTRALIA IMPORT D&D
  • VIETANM IMPORT D&D
  • VIETANM EXPORT D&D
  • CHINA IMPORT D&D
  • CHINA EXPORT D&D
Demurrage and Detention IMPORT to USA (Effective date :UIIA—2023/2/15)
Curr:USD
Equipment Type
DEMURRAGE
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Special Container
  • Special Container
  • Reefer Container
  • Reefer Container
  • 1--4 CD
    0
    0
    0
    0
  • 5--9 CD
    260
    260
    260
    260
  • Thereafter CD
    340
    340
    340
    340
  • 1--4 CD
    0
    0
    0
    -
  • Thereafter CD
    350
    350
    350
    -
  • 1--3 CD
    0
    0
    0
    -
  • Thereafter CD
    480
    480
    480
    -
Equipment Type
DETENTION
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Special Container
  • Special Container
  • Reefer Container
  • Reefer Container
  • 1--4 WD
    0
    0
    0
    0
  • 5--9 CD
    190
    190
    190
    190
  • Thereafter CD
    280
    280
    280
    280
  • 1--3 WD
    0
    0
    0
    0
  • Thereafter CD
    300
    300
    300
    300
  • 1--3 WD
    0
    0
    0
    0
  • Thereafter CD
    400
    400
    400
    400
HISTORY INQUIRY
  • EFFECTIVE
  • 2022/04/13
  • US DEMURRAGE
    20
    40/40H/45
  • DAY1-DAY4(Working Day)
    0
    0
  • US DETENTION
    20
    40/40H/45
  • DAY1-DAY4(Working Day)
    0
    0
  • EFFECTIVE
  • 2022/05/22
  • DETENTION
    20
    40/40H/45
  • DAY5-DAY9(Calender Day)
    190
    190
  • DAY10+(Calender Day)
    280
    280
  • EFFECTIVE
  • 2022/04/13
  • DEMURRAGE
    20
    40/40H/45
  • DAY5-DAY9(Calender Day)
    260
    260
  • DAY10+(Calender Day)
    340
    340
Any Dispute In D&D,???Click Here
美国进口滞期费/滞箱费细则

DEM: DEMURRAGE滞期费
DET: DETENTION滞箱费
ADDITIONAL FREETIME: (额外)免费使用期

1)进口滞期费和滞箱费定义及适用范围:
1)滞期费和滞箱费针对所有进口提单目的地为美国境内的集装箱;
2)滞期费适用范围包括:从集装箱卸船次日起,到收货人实际提箱日为止;如果是内陆点则从铁路落地次日到收货人实际提箱日;
3)滞箱费适用范围包括:从收货人实际提箱次日起,到归还集装箱于承运人指定场地之日为止。

2)进口滞期费和滞箱费计算规则:
1)承运人对滞期费和滞箱费不予信用账期;
2)承运人对滞期费和滞箱费以美元计费;
3)承运人对滞期费计算从卸船次日起算;如果是内陆点则从铁路落地次日起算;到收货人实际提箱日为止
4)承运人对滞箱费计算从收货人实际提箱次日起,到归还集装箱于承运人指定场地之日为止
5)如果由于港口、码头或内陆点铁路站的客观原因(包括天灾等),导致进口集装箱无法提取,承运人同意进口滞期费以码头公布的最早可提取日起算,具体情况以实际码头或铁路站公布信息为准;
6)承运人公布的滞期费和滞箱费费率所涉及的工作日(商业日)计算,不包括周六、周日及公共假日;
7)承运人公布的滞期费和滞箱费费率所涉及的日历日计算,包括周六、周日及公共假日。

3)额外免费期申请:
1)基于承运人已经公布的进口到美国的集装箱滞箱费免费期,货主对可以申请额外免费使用期;
2)收货人应当于装船前通过发货人向承运人提出书面申请,获得承运人书面确认后方可生效;
3)承运人不接受对进口到美国的集装箱滞期费申请额外免费使用期。

4)争议处理:
1)收货人对于承运人(或其指定代理人:包括码头和船代)计算收取的滞箱费或滞期费金额有争议的,应当在滞箱费或滞期费发票签发后30日历日内,以书面形式向承运人相关D/D负责人提出申诉,附上相关证据,包括但不限于:
    a)相关滞箱费或滞期费发票,箱号,货物编号(订舱号或提单号),
    b)争议理由,例如:
        i.免费期计算错误(应当附上承运人的额外免费使用期确认或相关文件证明)
        ii.费率计算错误(应当附上正确费率或相关文件证明)
        iii.日期计算错误(应当附上相应集装箱进出场证明)
        iv.其他原因(应当列明具体信息及相关文件证明)
2)承运人相关D/D负责人:Mr.Parker Zhu, (usadd@bal.cn)
3)承运人相关D/D负责人会在收到争议申诉后5个工作日内给与明确的答复或者解决方案。

Demurrage and Detention EXPORT from USA (Effective dated :UIIA—2023/2/15)
Curr:USD
Cargo Nature/Equipment Type
DEMURRAGE
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Special Container
  • Special Container
  • Reefer Container
  • Reefer Container
  • 1--4 WD
    0
    0
    0
    0
  • 5--9 CD
    260
    260
    260
    260
  • Thereafter CD
    340
    340
    340
    340
  • 1--4 WD
    0
    0
    0
    0
  • Thereafter CD
    350
    350
    350
    350
  • 1--3 WD
    0
    0
    0
    0
  • Thereafter CD
    480
    480
    480
    480
Cargo Nature/Equipment Type
DETENTION
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Special Container
  • Special Container
  • Reefer Container
  • Reefer Container
  • 1--4 WD
    0
    0
    0
    0
  • 5--9 CD
    190
    190
    190
    190
  • Thereafter CD
    280
    280
    280
    280
  • 1--3 WD
    0
    0
    0
    0
  • Thereafter CD
    300
    300
    300
    300
  • 1--3 WD
    0
    0
    0
    0
  • Thereafter CD
    400
    400
    400
    400
Any Dispute In D&D,???Click Here
美国出口滞箱费细则

DET: DETENTION滞箱费
FREETIME: (额外)免费使用期

1.出口滞箱费适用范围:
1)针对所有出口提单启运地为美国境内的集装箱。
2)滞箱费适用范围包括:从发货人实际提箱日起,到归还集装箱于承运人指定场地之日为止。

2.出口滞箱费计算规则:
1)承运人对滞箱费不予信用账期;
2)承运人对滞箱费以美元计费;
3)承运人对滞箱费计算从发货人实际提箱日起,到归还集装箱于承运人指定场地之日为止
4)如果由于承运人指定场地(港口、码头或内陆点铁路站)的客观原因(包括天灾等),导致指定集装箱无法及时归还,承运人同意滞箱费以码头公布的最早可归还日进行减免,具体情况以实际码头或铁路站公布信息为准;
5)承运人公布的滞箱费费率所涉及的工作日(商业日)计算,不包括周六、周日及公共假日;
6)承运人公布的滞箱费费率所涉及的日历日计算,包括周六、周日及公共假日。

3.额外免费期申请:
1)基于承运人已经公布的美国出口集装箱滞箱费免费期,发货人对可以申请额外免费使用期;
2)发货人应当于提取空箱前向承运人提出书面申请,获得承运人书面确认后方可生效。

4.争议处理:
1)发货人对于承运人(或其指定代理人:包括码头和船代)计算收取的滞箱费金额有争议的,应当在滞箱费发票签发后30日历日内,以书面形式向承运人相关D/D负责人提出申诉,附上相关证据,包括但不限于:
    a)相关滞箱费或滞期费发票,箱号,货物编号(订舱号或提单号),
    争议理由,例如:
        i.免费期计算错误(应当附上承运人的额外免费使用期确认或相关文件证明)
        ii.费率计算错误(应当附上正确费率或相关文件证明)
        iii.日期计算错误(应当附上相应集装箱进出场证明)
        iv.其他原因(应当列明具体信息及相关文件证明)
2)承运人相关D/D负责人:Mr.Parker Zhu, (usadd@bal.cn)
3)承运人相关D/D负责人会在收到争议申诉后5个工作日内给与明确的答复或者解决方案。

Demurrage and Detention IMPORT to Canada(Effective date:2023-7-1)
Equipment Type
DEMURRAGE
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
DETENTION
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Special Container
  • Special Container
  • Special Container
  • Special Container
  • Reefer Container
  • Reefer Container
  • Reefer Container
  • Reefer Container
  • 1--3 WD
    0
    0
    0
    0
  • 4--8 CD
    150
    150
    150
    150
  • 9--12 CD
    190
    190
    190
    190
  • Thereafter CD
    210
    210
    210
    210
  • 1--3 WD
    0
    0
    0
    0
  • 4--7 CD
    280
    280
    280
    280
  • 8--10 CD
    350
    350
    350
    350
  • Thereafter CD
    380
    380
    380
    380
  • 1--2 WD
    0
    0
    0
    0
  • 3--5 CD
    360
    360
    360
    360
  • 6--8 CD
    460
    460
    460
    460
  • Thereafter CD
    500
    500
    500
    500
  • 1--3 WD
    0
    0
    0
    0
  • 4--8 CD
    150
    150
    150
    150
  • 9--12 CD
    190
    190
    190
    190
  • Thereafter CD
    210
    210
    210
    210
  • 1--3 WD
    0
    0
    0
    0
  • 4--7 CD
    280
    280
    280
    280
  • 8--10 CD
    350
    350
    350
    350
  • Thereafter CD
    380
    380
    380
    380
  • 1--3 WD
    0
    0
    0
    0
  • 4--5 CD
    360
    360
    360
    360
  • 6--8 CD
    460
    460
    460
    460
  • Thereafter CD
    500
    500
    500
    500
Demurrage and Detention EXPORT from Canada(Effective date:2023-7-1)
Cargo Nature/Equipment Type
DEMURRAGE
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
DETENTION
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Special Container
  • Special Container
  • Special Container
  • Reefer Container
  • Reefer Container
  • Reefer Container
  • 1--5 WD
    0
    0
    0
    0
  • 6--8 CD
    150
    150
    150
    150
  • Thereafter CD
    180
    180
    180
    180
  • 1--3 WD
    0
    0
    0
    0
  • 4--7 CD
    260
    260
    260
    260
  • Thereafter CD
    330
    330
    330
    330
  • 1--4 WD
    0
    0
    0
    0
  • 5--8 CD
    350
    350
    350
    350
  • Thereafter CD
    420
    420
    420
    420
  • 1--5 WD
    0
    0
    0
    0
  • 6--8 CD
    150
    150
    150
    150
  • Thereafter CD
    180
    180
    180
    180
  • 1--3 WD
    0
    0
    0
    0
  • 4--7 CD
    260
    260
    260
    260
  • Thereafter CD
    330
    330
    330
    330
  • 1--4 WD
    0
    0
    0
    0
  • 5--8 CD
    350
    350
    350
    350
  • Thereafter CD
    420
    420
    420
    420

Remark 1*
1.1. DEFINITION— IMPORT//DEMURRAGE : From the next day of container unloading from the vessel till the day of container picking-up by the consignee; If the destination is an inland point, then it includes the next day of landing from rail, till the day of container picking-up by the consignee;
1.2. DEFINITION— IMPORT//DETENTION: From the next day of container picking-up by the consignee, till the day of container returning to the site designated by the carrier;
1.3. DEFINITION— EXPORT//DETENTION: From the day when the shipper actually picks up the container, till the day when the container is returned to the site designated by the carrier;
1.4. NO FREE TIME for container which is released empty and later re-delivered empty (i.e. empty to empty) without an export shipment,no matter if free time provisions are filed in service contracts or in this tariff;
1.5. IF the container failed to returning to the site designated by the carrier ,a penalty as $500 / TEU will be charged in addition to the tariff;
1.6. The tariff doesn’t include any storage and reefer charges at port, rail, all these charges should be paid by customer directly;

Remark 2*
2.1. FOR LIVE REEFERS: The following tariff is not applicable to any charges that may be incurred by live reefers, including but not limited to power supply and plug in/out, etc;
2.2. NOR = Non Operating reefer; Special Container=Flat Rack, Open Top, Tank;
2.3. WD =WORKING DAY; CD=CALENDA DAY;
2.4. CURRENCY =USD;

Demurrage and Detention IMPORT to Mexico (updated on Aug,2022)
Cargo Nature/Equipment Type
Demurrage and Detention
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Special Container
  • Special Container
  • Reefer Container
  • Reefer Container
  • 1--7 CD
    0
    0
    0
    0
  • 8--14 CD
    160
    160
    160
    160
  • 15--18 CD
    165
    165
    165
    165
  • Thereafter CD
    170
    170
    170
    170
  • 1--5 CD
    0
    0
    0
    -
  • Thereafter CD
    180
    180
    180
    -
  • 1--3 CD
    0
    0
    0
    -
  • Thereafter CD
    210
    -
    210
    -

Remark 1*
1.1. DEFINITION— IMPORT//DEMURRAGE & DETENTION : From the day of container unloading from the vessel till the day of container returning to the site designated by the carrier
1.2. DEFINITION— EXPORT//DEMURRAGE & DETENTION: From the day when the shipper actually picks up the container, until the day of the cut off time of the booking;
1.3. NO FREE TIME for container which is released empty and later re-delivered empty (i.e. empty to empty) without an export shipment,no matter if free time provisions are filed in service contracts or in this tariff
1.4. IF the container failed to returning to the site designated by the carrier ,a penalty as $500 / TEU will be charged in addition to the tariff

Remark 2*
2.1. FOR LIVE REEFERS: The following tariff is not applicable to any charges that may be incurred by live reefers, including but not limited to power supply and plug in/out, etc.
2.2. NOR= Non Operating reefer; Special Container=Flat Rack, Open Top, Tank
2.3. WD=WORKING DAY; CD=CALENDA DAY ;
2.4. CURRENCY=USD

Demurrage and Detention EXPORT from Mexico (updated on Aug,2022)
Cargo Nature/Equipment Type
Demurrage and Detention
  • Day Range
    20'
    40'
    40'HQ
    45'HQ
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Dry Container incl NOR
  • Special Container
  • Special Container
  • Reefer Container
  • Reefer Container
  • 1--7 CD
    0
    0
    0
    0
  • 8--14 CD
    160
    160
    160
    160
  • 15--18 CD
    165
    165
    165
    165
  • Thereafter CD
    170
    170
    170
    170
  • 1--5 CD
    0
    0
    0
    -
  • Thereafter CD
    180
    180
    180
    -
  • 1--3 CD
    0
    0
    0
    -
  • Thereafter CD
    210
    -
    210
    -

Remark 1*
1.1. DEFINITION— IMPORT//DEMURRAGE & DETENTION : From the day of container unloading from the vessel till the day of container returning to the site designated by the carrier
1.2. DEFINITION— EXPORT//DEMURRAGE & DETENTION: From the day when the shipper actually picks up the container, until the day of the cut off time of the booking;
1.3. NO FREE TIME for container which is released empty and later re-delivered empty (i.e. empty to empty) without an export shipment,no matter if free time provisions are filed in service contracts or in this tariff
1.4. IF the container failed to returning to the site designated by the carrier ,a penalty as $500 / TEU will be charged in addition to the tariff

Remark 2*
2.1. FOR LIVE REEFERS: The following tariff is not applicable to any charges that may be incurred by live reefers, including but not limited to power supply and plug in/out, etc.
2.2. NOR= Non Operating reefer; Special Container=Flat Rack, Open Top, Tank
2.3. WD=WORKING DAY; CD=CALENDA DAY ;
2.4. CURRENCY=USD

Demurrage And Detention In EUROPE
Curr:EUR
    • Dry
      20GP
      40GP/NOR
      40HQ
    • 1-10
      0
      0
      0
    • 11-15
      40
      60
      60
    • 16-20
      60
      90
      90
    • 21-
      80
      130
      130
    • Special
      20OT/FR
      40OT/FR
    • 1-7
      0
      0
    • 7-10
      50
      80
    • 11-15
      70
      130
    • 16-
      90
      160
    • Reefer
      20RF
      40RH
    • 1-7
      0
      0
    • 7-10
      120
      130
    • 11-15
      140
      150
    • 16-
      150
      180
Demurrage And Detention Import AUSTRALIA
Combined Detention & Demurrage (Dry)
RATE AUD
  • 费用
  • FREE TIME
  • FREE TIME
  • FREE TIME
  • FREE TIME
  • CALENDAR DAY
    20DV
    40DV/40H/40NOR
  • 8 DAYS
    0
    0
  • DAY9-DAY14
    85
    158
  • DAY15-DAY19
    130
    218
  • thereafter
    160
    280
Demurrage And Detention Import HCM / HPH(Updated On Jan.22)
No free time for any equipment which is originally picked up for export booking but returned as empty. Equipment charges will commence on the day of the equipment release and end on the day of equipment return.
Curr:USD
  • Cargo Nature/Equipment Type
    Dry Container
    Dry Container
    Special Equipment
    Special Equipment
    Reefer Container
    Reefer Container
  • Free Time (CALENDAR DAY)
    7
    5
    3
  • Day Range
    8--14
    Thereafter
    6--10
    Thereafter
    4--6
    Thereafter
  • 20'
    15
    30
    40
    50
    75
    100
  • 40'
    30
    60
    80
    100
  • 40'HQ
    30
    60
    80
    100
    100
    125
  • 45'HQ
    30
    60
    -
    -
    -
    -
Demurrage And Detention Export HCM / HPH (Updated On Dec.21)
No free time for any equipment which is originally picked up for export booking but returned as empty. Equipment charges will commence on the day of the equipment release and end on the day of equipment return.
Curr:USD
  • Cargo Nature/Equipment Type
    Dry Container
    Dry Container
    Special Equipment
    Special Equipment
    Reefer Container
    Reefer Container
  • Free Time (CALENDAR DAY)
    7
    3
    3
  • Day Range
    8--12
    Thereafter
    4--6
    Thereafter
    4--6
    Thereafter
  • 20'
    20
    30
    40
    50
    50
    60
  • 40'
    40
    30
    80
    100
    100
    120
  • 40'HQ
    40
    60
    80
    100
    100
    120
  • 45'HQ
    40
    60
    -
    -
    -
    -
Demurrage And Detention Import CHINA
Curr:RMB
    • Dry
      20GP
      40GP
      40HQ
    • 1-7(7)
      0
      0
      0
    • 8-17(10)
      60
      120
      140
    • 18-37(20)
      120
      240
      280
    • 38-
      240
      480
      560
    • Special
      20OT/FR
      40OT/FR
    • 1-5(5)
      0
      0
    • 6-13(8)
      100
      200
    • 14-38(25)
      200
      400
    • 39-
      400
      800
    • Reefer
      20RF
      40RH
    • 1-5(5)
      0
      0
    • 6-13(8)
      170
      340
    • 14-38(25)
      340
      680
    • 39-
      680
      1360
Detention Export CHINA
Curr:RMB
    • Dry
      20GP
      40GP
      40HQ
    • Day 1-7(7)
      0
      0
      0
    • Day 8-17(10)
      60
      120
      140
    • Day 18-37(20)
      120
      240
      280
    • Day 38
      240
      480
      560
    • Special
      20OT/FR
      40OT/FR
    • Day 1-5
      0
      0
    • Day 6-13
      100
      200
    • Day 14-38
      200
      400
    • Day 39
      400
      800
    • Reefer
      20RF
      40RH
    • Day 1-5
      0
      0
    • Day 6-13
      170
      340
    • Day 14-38
      340
      680
    • Day 39
      680
      1360